Home > GoldEx > History
History

2015 A hot potcasting production line is added and put into production;a 2000T

doubleactionreverse extrusionproduction line is added andplanned to beputinto

production by the end of 2015

———————————————————————————————————————————————

2014 A 1250T double-action reverse extrusion production line was addedand put nto

production.

———————————————————————————————————————————————

2013 Acquired eight patents for utility models; independently researchedanddeveloped

new JL- 30 aluminum alloy materials; metal processing workshopwasbuilt and

put into production

———————————————————————————————————————————————

2012 Inteoducing 16T Billet-casting workshop

———————————————————————————————————————————————

2011 Plant construction was completed and put into production

———————————————————————————————————————————————

2010 Guangdong GoldEx Light Alloy Co.,Ltd. was established